Permit-ready civil & structural engineering for Northwest Florida builders and pool contractors.

Get drainage, site, and structural plans that pass review and get built.

Civil Engineering / Site Design

Civil

  • Drainage plans
  • Site plans
  • Subdivision
  • Government / municipalities
Start Civil Intake →
Servicing: Santa Rosa County, FL
Residential Structural

Structural

  • New construction
  • Additions / remodeling
  • Accessory structures
  • Alterations / repairs
Start Structural Intake →
Servicing: Northwest Florida & South Alabama, excluding Mobile County

Trusted by 40+ builders & pool contractors in Santa Rosa County

Why SSUD

Get it engineered.
Get it permitted.
Get it built.

Strong local experience with practical, construction-grounded design — and dependable, permit-ready execution for Northwest Florida and South Alabama projects.

2001established in Northwest Florida
2disciplines under one roof: civil + structural
FL + ALcivil in Santa Rosa County; structural across Northwest Florida and South Alabama
40+Trusted builders and pool contractors
Two disciplines, one firm

Choose the right engineering lane.

Most projects need one of two things. Pick your path and SSUD gets you to the right plans, scope, and next step.

Civil Engineering / Site Design

Drainage, site & utility plans.

Serving Santa Rosa County with plans that get your lot, pool, or development approved — and water moving where it should.

  • Lot drainage plans
  • Pool drainage plans
  • Site plans & grading
  • Stormwater design
  • Utility design
  • Development & permitting support
Structural Engineering

Structural plans & wind load.

Serving Northwest Florida and South Alabama, excluding Mobile County, with residential structural design that meets applicable code and field requirements.

  • Wind load engineering
  • Residential structural design
  • Builder plan support
  • Framing details
  • Foundations, beams & headers
  • Door, window & opening modifications
Starting a project

Three steps to your plans.

No guessing about what to send. A typical drainage or structural request starts with the right facts, a clear quote, and permit-ready plan delivery.

STEP 01

Tell us about the project

Send the property address, your role, permit details, and any survey or site plan you have.

STEP 02

Get your quote

SSUD reviews the request and sends project-specific pricing and a clear scope.

STEP 03

Receive permit-ready plans

SSUD prepares and delivers the engineered plans your county, builder, or contractor needs.

Built for the people who get things built

Practical, local, construction-grounded engineering.

“Permit-ready civil and structural engineering — practical, local, and grounded in real construction.”

Website positioning statement

Best-fit clients

“If you build homes, pools, or small developments in Santa Rosa County or Northwest Florida, you’re who we’re built for.”

  • Production and custom home builders
  • Pool contractors and general contractors
  • Developers and homeowners planning new construction or additions
  • Local and public sector projects

Join 40+ local builders and pool contractors who rely on SSUD for permit-ready plans.

Call the office to talk through your project, or start the right intake and SSUD will follow up with a quote and next steps.

Talk to a Professional

No obligation. No pressure. Just honest answers.

All fields except Message are required. Submitting opens a pre-addressed email draft to SSUD.